Wednesday 29 May 2013

Piering and plumbing

The tradies were scheduled today to do the piering and plumbing.
I went to the site after work to check if it really happened. It was too dark to take pictures so I will be going during the weekend to take pictures  : )

Wednesday 22 May 2013

Site cut



The excavator was supposed to bench the land on the 16th of May, but as usual nothing goes as planned, he was a no show, after me calling the office multiple of times, they couldnt tell me why the excator didn't do anything. It was the perfect time to do it since it was sunny for the past few weeks.
The excavation has been re-scheduled for the following week on the 22nd of May. A week that was forecasted to be rainning all day long


                                                    Land flattened                                        




                                         Rain make the work go slower




Thursday 9 May 2013

Portaloo and fence up !!


Drove to my land to visit and big surprise !!! there is a portaloo installed and the land had been fenced !!! Time for some action : )   Hopefully by next week, the site cut will start, then the slab!
It took Wisdom 10 days to start something on the land since we had been in their estimating/construction team.